eng
All categories
Amsterdam
Dismantling, installation, start-up of Siemens SGT100 power plants
Dismantling, installation, start-up of Siemens SGT100 power plants - photo 1
Renewed: 26 December 2020, 12:05

Dismantling, installation, start-up of Siemens SGT100 power plants

$361,000/service
Delivery terms: EXW Belgorod
Фиатов Геннадий
инженер консультант
,  Belgorod, RU
Flagma member since 18 April 2015

Description

The gas turbine engine service company provides services all over the world.
Decommissioning, dismantling, transportation, installation, start-up of Siemens SGT100 power plants.
We provide a full range of services for such projects.
- Preparation of the Sales and Purchase Agreement;
- Assessment of the risks required for safe decommissioning;
- Preparation of instructions and descriptions;
- Manufacturing and delivery of a special GTR container;
Providing tools and fixtures to preserve the resource of gas turbine equipment and to facilitate difficult equipment retrieval;
- We carry out the physical dismantling and removal of all related equipment from the location of the power plant;
- Moving around the territory and loading at the port, with subsequent export;
- Delivery to the place of demand;
- Unloading the power plant at the place of regular use and the end user;
- Mounting;
- Configuring all systems and starting.
We provide similar services for SGT100 gas turbine power plants all over the world.
We have a wealth of experience in similar work, including in the Pacific Rim countries.

We carry out overhaul and emergency repairs of SGT100 turbines.
We work according to the repair documentation of the manufacturer.
The work is performed on the basis of the Major Overhaul Manual.
Development of technical specifications
(Technical inquiry) based on repair documentation.
Please contact our duty engineers and consultants for more detailed information.
Please contact by WhatsApp

Ad number: 1762908   |  views: 5  
,  Belgorod, RU
Flagma member since 18 April 2015
Still looking for:

Similar ads

Installation, configuration and start-up power plants Ruston SGT-200
$650,000/pc EXW
Stanok expert, LLC, RU, 46 km +37 ads
Installation, configuration and commissioning of gas turbine power plants Siemens (Ruston) SGT-200 with a capacity of 6.5 MW. The gas turbine...
Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom
256,000/pc EXW
Stanok expert, LLC, RU, 46 km +37 ads
Installation and start-up of power plants with gas turbine engines type SGT from such manufacturers as Ruston, ABB, Alba Power, Alstom, Siemens...
Show more
Contact the company
Фиатов Геннадий
инженер консультант
By phone
In messenger
Say, that you found an ad on Flagma
Safety rules: Do not agree to a prepayment if you are not sure about the reliability of the company.
Write a message
Select category
×
Login to your account